The 7 Roles and Responsibilities of a QAQC Engineer

Sharing is Caring:
80 / 100

This is just a continuation of my previous post about the duties and responsibilities of a QA/QC Engineer. I want to write more rolesandresponsibilitiesofaqaqcin order to help new engineers to easily learn these roles and responsibilities of a qaqc engineer and use them with their quality engineering career.

It is important that you should know the quality assurance and quality control engineer roles and responsibilities. These could be your guidelines to follow and you can make as your routine. By following these roles, I don’t think you will be derailed in your quality engineering career.

 

Here are 7 roles and responsibilities of a QAQC Engineer in a construction project.

1. Review the Material Technical Data Sheet

Every material data sheet of the material to be supplied to the project has to be read by a quality engineer. Especially when the material is about to submit to the Engineer or Consultant, it must have to be reviewed properly because sometimes the properties of the material do not comply with the requirement of the specification, then that would probably be rejected and will cause a waste of time and eventually create delays. It might even better if you will prepare a comparison sheet before you finally submit the material to the Engineer.

2. Preparation of Method Statement (this is one of the important roles and responsibilities of a qaqc engineer)

A QA/QC Engineer shall develop a method statement for the particular work on the site. He will make sure that it is submitted to the Consultant or Engineer and should be approved prior to starting the job on the site. The QA/QC Engineer shall prepare the method statement ahead of schedule for the jobs and consider making a plan for all the method statements preparation and submission.

Read also:  How To Control Materials And Delivery To The Construction Site

3. Review Method Statement approval or comments of the Engineer and take action

When you received the approval or comments on the method statement the quality engineer will review it, any corrective action in the comments shall be immediately complied with and eventually revert back for final approval. Do not keep the comments on your hand for a long period of time because the construction team cannot proceed with the works until the method statement is finalized.

4. Submit Inspection Request for Engineers Inspection

Inspection request shall be submitted to the Engineer for approval of a certain job before you can proceed with the succeeding work. You shall make sure that the job to be inspected is completed so that there will be no revisions or rejection of the inspection. The job will be inspected after 24 hours the Inspection Request is submitted so, always be reminded of that matter because the Engineer will not accept any outright request for inspection.

Read also:  Difference Between SBS Modified Waterproofing Membrane and Liquid Type Waterproofing

You shall make sure that the Inspection and Test Plan is approved before raising an inspection request. And remember that this is also one of the important roles and responsibilities of a qaqc engineer. You should prioritize this role.

Related: How to Prepare a good Inspection and Test Plan Part – 1

5. Issue Internal NCR or Site Observation

You can issue an internal nonconformance report and site observation to the subcontractors and site construction team. Before issuing an NCR to the concerned trades make sure you issue first the site observation report, give them at least 72 hours to take action, but before that, they should submit the corrective action and if after 72 hours there is no action then you may issue an NCR.

If you do not want to feel like you are cruel to them you may give verbal instruction or advice and if they will not take urgent action from your advice then you may proceed to issue site observation.

6. Conduct regular Site Surveillance

As a quality engineer make a routine to conduct site surveillance, you may schedule it for your own like every day or every other day. You might ask why “site surveillance?” This is to check if the works on site are moving as per drawing, as per material approved, as per method statement and as per quality control procedure. And the safety of people doing the work, you have a right to stop them from doing unsafe work, though it is Safety Officers in-charge to do it.

Read also:  7 Characters Of A Quality Engineer That You Should Maintain

This number 6 roles and responsibilities of a qaqc engineer is a task that you can never be neglected as you will find this role interesting because you will discover what is going on on site.

7. Prepare QA/QC Reports

The quality engineer shall prepare a QA/QC weekly report. You shall state all the activities that you performed in the past week and the critical issues that you have noticed. The documents submitted and to be submitted shall also be included in your report.

A monthly report shall be prepared by a quality engineer but, this is just a project case basis. If you are to be involved in a huge project like a billion worth of project, then it’s not you will prepare the monthly report.

If you enjoyed reading this post about the 7 Roles and Responsibilities of a QAQC Engineer, please share with your favorite social network below. You may write your comments in the comment box below.

Sharing is Caring:

55 Comments

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

You cannot copy content of this page